What is the Cost of KSEB Service Connection with Posts? |KSEB Over Head (OH) Connection Charges |KSEB ECSC

In this article, let's create a basic idea about KSEB ECSC (Estimate Cost for Service Connection ) rates.You have to pay CD(Cash Deposit )rates, in addition with this, GST is  not applicable for CD.

Case1

If the consumer needs  a Weather  Proof Support (WPS)i.e, a bare post without  (Now 8 meter  PSC poles are provided ), cross arms and insulators.
Then
ECSC=₹5540
CGST(9%)+SGST(9%)=₹997.2
You have to add normal(WP) charges with  this.
1.₹2071 (Single  Phase )
2.₹5022(There  Phase )
So Total ECSC=5540+997.2+2054=₹8591.
(Single  Phase ).
This  will applicable in all the following cases.

Case  2

If the consumer has to construct a single phase 2 wire line with length less than 50 meters.
Here the basic  ECSC rate=₹9160
In addition to this ₹80 per meter.
Suppose the length of oh line =35 meters
Then total cost is calculated as follows :
9160+80*40=₹12360
GST(SGST(9%)+CGST(9%)-18%=₹2224.8

Total =₹14586
(One post with one stay)
Also, if the way of line is not straight, an additional post is needed, then  it's treated as post insertion in single phase line.
The basic rates as follows, you have to pay GST(18%)) in addition to the amount shown here.

Pole insertion with  stay-₹8170.
Pole insertion without stay-₹6700.
Case 3

If the consumer has to construct a single phase 2 wire line with length more  than 50 meters and less than 100 meters, with two posts.
Here the basic  ECSC rate=₹21950
In addition to this ₹80 per meter for length  above 50 meters .
Suppose the length of OH line =90 meters
Then total cost is calculated as follows :
21950+80*40=₹25150
GST(SGST(9%)+CGST(9%)-18%=₹4527

Total =₹29677.
The following are some common services in OH connection and their basic rates as per KSEB Cost Data, you have to pay GST(18%) in addition to the amount shown here.You can calculate charges for any type of construction, but the amount may differ due to changes in material estimate.
 
1.Pole insertion  in single phase line with strut-₹13850.
2.Pole insertion in three phase line with stay -₹9200.
3.Pole insertion in three phase line without stay -₹7730.
 
To know more  Click  Here

No comments:

Post a Comment

Contact Form

Name

Email *

Message *

Featured Post

Cost of KSEB Service Connection with Posts w. e.f 08.02.2024|KSEB Over Head (OH) Connection Charges |KSEB ECSC

In this article, let's know about revised KSEB ECSC (Estimate Cost for Service Connection ) rates w.e.f 08.02.2024.There is no change in...