Dismantling  of Electricity  Connection |KSEB Connection Removal on Request |Fee's and Procedures.

If you don't want your KSEB  service connection permanently,it can be dismantled upon your written request along  with your photo id proof. 

First of all you must clear all the arrears. You will have to pay ₹130 (Including GST)as Dismantling fee.
According to the priority, your  connection will be dismantled within a period of  10 days  by KSEB  Staff(They will  take your Meter  and Service wire back) . A final bill is prepared based on FR (Final Reading )of your meter, as on the dismantled date. 

You have to request to adjust  your Security  Deposit  in the final bill befor your  account closure.Then you have to pay the balance amount if required. If the Security  Deposit is a huge amount, you have to apply for it's refund.
 
Remember, after Dismantling, you will not get  the connection back.
In short, 
In case a consumer desires his service to be dismantled and the service connection agreement to be terminated, he shall apply for the same in the format specified in Annexure - 20 to the Code.
The KSEB Ltd. shall give a written acknowledgment of receipt of such request, on the spot.
The KSEB Ltd. shall, within ten days from receipt of the request, carry out a special reading and prepare a final bill including all arrears up to the date of such billing.

The KSEB Ltd. may disconnect the supply of electricity immediately after the special reading is taken.
 On payment of all dues by the consumer, the KSEB Ltd. shall issue a No Dues Certificate and a receipt for the payment with the words ‘Final Bill’ stamped on it.

Thereafter, the KSEB Ltd. shall not have any right to recover any charge for any period prior to the date of final billThe KSEB Ltd. shall not raise any bill after dismantling.

No comments:

Post a Comment

Contact Form

Name

Email *

Message *

Featured Post

Cost of KSEB Service Connection with Posts w. e.f 08.02.2024|KSEB Over Head (OH) Connection Charges |KSEB ECSC

In this article, let's know about revised KSEB ECSC (Estimate Cost for Service Connection ) rates w.e.f 08.02.2024.There is no change in...