✅ Eligibility
Premises must lie within 35 m of an existing electric post.
Connection will be through a service wire.
New connections are granted based on priority order.
💰 Fees & Charges (to be paid at the Electrical Section)
Charge | Amount | Notes |
---|---|---|
Application Fee (AF) | ₹ 50 | Same whether application is online or offline |
Cash Deposit (CD) | Depends on connected load (kW) | Rate differs by usage category: Domestic: ₹ 300 / kW Construction / Commercial / Religious: ₹ 1,000 / kW Agriculture / Anganvadi: ₹ 200 / kW Industrial: ₹ 500 / kW |
ECSC (Estimate Cost for Service Connection) | Single Phase: ₹ 1,914 Three Phase: ₹ 4,642 | Flat rates depending on whether single or three phase connection |
If your Connected Load is 3756 Watts in Domestic tharif, You have to pay 4X300= ₹1200
ECSC=₹1914
Total=₹3114